What Happens to an Appliance Repair Job That's Waiting on a Part
By Oleg Goriachev · Appliance repair business owner and Taskrol founder
The short answer
A repair that needs a part stays in In Progress; nothing closes and no second record gets created. The technician watches for his own part. If the part is on the truck or the shelf, the repair finishes the same day. Otherwise the install is next business day. In Taskrol the parts search on the job shows van and warehouse stock, so he knows which case it is before he leaves the kitchen.
The technician is standing in the customer's kitchen and says the sentence that decides whether this visit is the last one: "I need to order a part." At Cactus Appliance that sentence comes up on close to every call. We run three technicians and about 150 jobs a month in Orange County, and a large share of those jobs don't finish on the first visit. Here's what happens to that job at our shop, from the kitchen to the install.
Most of what gets written about scheduling covers the first visit, which is the part that works everywhere. The job that can't close today is where an appliance shop makes or loses its money, and it's the half that gets skipped.
The job goes to In Progress and stays there
We don't close the job and we don't open a second one. The same job moves to In Progress and sits in that status until the part is in the machine. It stays on the same board as everything else, so if someone in the office filters the list by In Progress, they're looking at every job that's waiting on a part.
The part belongs to the technician who ordered it. He ordered it, so he's the one who knows what's coming and notices when it shows up. Nobody at Cactus has a job called watching the parts queue, because there isn't a queue. There's a job with a status on it and a technician who wants to finish it.
Who calls the customer
Depends on the shop. When it's one man and a van, he calls the customer himself, because there's nobody else to do it. When there's an office, the operator makes the call. We have an office, and it still goes both ways here. Some days the technician calls, some days the office does, and which one it is depends on the day.
Same day, or the next business day
What happens next sorts by where the part is. If it's on the truck or on the shelf at the shop, the repair finishes the same day. Sometimes, when the schedule allows it, the technician makes a run to the supply house and does the install the same day. Everything else is the next business day. That's the rule at Cactus.
Next business day is possible for one reason. We know what we own before the technician leaves the kitchen.
Why it's a stock question, not a calendar question
Here's what the technician does in that kitchen. The model number is on the job, so he searches the part right there. Taskrol shows him whether it's in his van and which cell it's in, and whether it's on the shelf in the warehouse. He doesn't call the office and he doesn't wait for someone to walk back and look. If we own it, today. If we don't, the part goes on the shopping list from the same screen and the job stays In Progress.
A calendar can't book the install until somebody knows whether the shop owns the part. Put that answer on the technician's phone while he's still standing next to the appliance and the rest follows. The part is on the shopping list before he's back in the truck, and the second visit isn't waiting on a phone call to find out what's on the shelf.
That's why I say a scheduling problem in this trade turns out to be an inventory problem. The calendar is the easy half.
Nothing gets lost, but the speed differs
I want to be straight about something, because it's easy to write a scare story here. Jobs waiting on parts don't get forgotten. Every shop I know runs a CRM, and the open job is sitting right there in it. When one does slip, a person made the mistake, and no software fixes that. So I'm not going to tell you that switching software saves jobs you're losing, because you're not losing them.
What does differ from shop to shop is the clock: how long from the sentence in the kitchen to the part in the machine. At Cactus it's the next business day, and it's that number because the stock check happens in the kitchen and not later. If your number is longer, that's the place to look.
Putting it on tomorrow's calendar
With the part in hand, the install goes on the calendar and the map like any other job. Someone still has to decide where in the day it lands, and at Cactus that someone is a person looking at the map. Taskrol doesn't order the day for you. There's no route optimization in it, and I'd rather say so here than have you find out later. For three trucks in one county a dispatcher who knows the crew beats a router, because the first question on any job is who can do it, and the map comes after that. Somewhere around six trucks, or a second county, that stops being true, and at that size you should buy a router from someone who sells one.
This post is one shop's process, not a comparison. If you want the whole field, I ranked fourteen scheduling products on this same question, and every product in it gets something named that it does better than ours.
One thing to check in your own shop
Take one job from last week that needed a part and count the days from the kitchen to the install. If the answer is next business day, your process is fine, whatever software it runs on. If it's longer, don't start with the calendar. Start with where the stock check happens, and how far the technician is from the customer when it does.